Skip to content

TrackOver for fiber and telecom construction crews

Fiber software to end footage in four group texts

The carrier keeps calling to ask where we are.

Footage against the contract, current locates, GPS photos and a live link for the prime. UtilityOps, free in the trial.

Free plan, or from $25 a user a month. 7-day trial, no card. See prices

  • No card to start
  • Cancel any time, no contract
  • Export your data whenever you want

Made for the field, with real jobs, crews and equipment in mind. Book a free 30-minute call and we set it up with you.

TrackOver job schedule on a phone, with the day's jobs, crew and status
The crew's day, on one screen
A TrackOver job page on a phone: customer, address, status and the invoice button
Each job, from address to invoice
A TrackOver estimate as the customer sees it on a phone
The estimate your customer accepts
A TrackOver invoice on a phone with the Pay now button
The invoice, with a pay button

Real screens from the TrackOver app, with a sample company's jobs.

Mark a run built from the truck. Sample route and data shown.

Locates, permits, photos, estimates and invoices are in the core app. Footage by project, the design map, splice and bore records, and the live link for the prime are UtilityOps, a separate add-on you can try free during the trial. Free plan at $0 with no card, then $25, $45 or $69 per user per month with a 3-seat minimum and a 7-day trial.

See how a fiber company runs one day in TrackOver

What you say on a bad day

The problem, and the screen that fixes it

  1. “The carrier keeps calling to ask where we are.”

    Each project carries its contracted footage. You see feet placed, percent done, your pace over the last working days and a projected finish against the target date. Send the prime a read-only link that shows built against remaining on the map, footage placed and structures in, and refreshes on its own.

    It takes: UtilityOps add-on

    UtilityOps projects tab on a phone: 9,600 of 24,000 ft built, 40 percent, about two weeks left, ahead of the target date
    Footage against the contract, with a finish date
  2. “The footage is in four group texts.”

    Log footage by day, crew and method (boring, trenching, plowing and more) and tie it to the project. The dashboard totals the last 7 and 30 days and each crew's feet, and exports to CSV.

    It takes: UtilityOps add-on

    UtilityOps production tab on a phone: feet today, last 7 days, last 30 days, and feet by crew
    Feet by day and by crew
  3. “Was the locate refreshed before Monday's shot?”

    Put the ticket number and mark-out date on the job. The expiry date fills in from the mark-out date, the job says how many days are left, and it checks that every utility has answered before it says Ready to dig.

    It takes: Free plan. The all-jobs 811 board is part of the UtilityOps add-on

    A TrackOver job page on a phone: mark-out expires in 2 days, 811 pending, and a Ready to dig check
    The ticket, with days left
  4. “The prime wants a closeout package by Friday.”

    Closeout on a project builds one zip: its footage, bores, splices, tests, permits, reels and restoration records, each as a CSV, with a summary on top.

    It takes: UtilityOps add-on

Start your 7-day free trial
  • No card to start
  • Cancel any time, no contract
  • Export your data whenever you want

What changes for fiber crews

  • Customers pay from a text

    Build the invoice from the job's hours and materials, text a link, and they pay from their phone. Overdue invoices get a reminder text for you, to customers who have agreed to texts.

  • Send the quote from the job site

    Price it from your own price book on your phone. The customer signs online, and it turns into the job and invoice with no retyping.

  • Know your profit on every job

    Quote against labor and materials used so far, live, with a warning when a job is on pace to run over.

Start your 7-day free trial
  • No card to start
  • Cancel any time, no contract
  • Export your data whenever you want

Sound like last week?

  • “The carrier keeps calling to ask where we are”
  • “The footage is in four group texts”
  • “The prime wants a closeout package by Friday”

What it does for your crew

The same platform in the office and on every phone in the field.

  • Your design file as a map
    Upload the engineering KMZ or KML and the route draws on the map. Crews mark runs built from the field. UtilityOps add-on.
  • Footage against the contract
    Placed feet, percent, pace and a projected finish per project. UtilityOps add-on.
  • A live link for the prime
    Read-only built-against-remaining map, footage placed and structures in. UtilityOps add-on.
  • Closeout in one download
    Footage, bores, splices, tests, permits, reels and restoration as CSVs in one zip. UtilityOps add-on.
  • Stamped photos
    Every camera photo keeps its location and time. Core app. On the route map, UtilityOps lets you attach a photo to the run or structure it belongs to.

What it costs

What a crew pays, with the math shown

An example crew of 6 (you, a locator and four on the bore and pull crews) for fiber and telecom construction crews. You pay per person who logs in, with a 3-seat minimum.

  • Pro$150 a month6 x $25Has every screen above
  • Premium$270 a month6 x $45
  • Elite$414 a month6 x $69

UtilityOps is a separate add-on, included free for the length of the trial. After the trial you choose whether to add it. There is also a Free plan (3 jobs, 30 photos, 3 users). No contract, and you can change plans anytime.

Your math

What does a slow week cost you?

Late invoices and paperwork nights have a price. Put in your own numbers.

Type your own numbers. They stay in your browser, nothing is sent anywhere.

Start 7-day free trial

From the first call to the last dollar

  1. 1

    The call comes in

    Add it as a job in a minute: address, contact, what they need.

  2. 2

    The board gets it scheduled

    Drag it onto a day and a crew. Their phones pick it up within a minute when the app is open and they have signal.

  3. 3

    The field documents itself

    Stamped photos, hours, and notes land on the job as the work happens.

  4. 4

    The invoice goes out in one tap

    One tap turns the finished job into an invoice with a pay link.

What we can honestly show you

  • Every screen on this page is the real app, filled with a made-up sample company. None of those names, jobs or prices belong to a real customer.
  • TrackOver's screens are laid out around a real job, from quote to paid invoice, not a design file.
  • We do not print customer quotes we do not have. Try it on one of your own jobs, or book a free 30-minute call and a real person sets it up with you.

Fair questions

Is UtilityOps included?

UtilityOps is coming soon and is not on general sale yet. During the 7-day trial you can use it on your own jobs. After the trial it locks, and nothing you entered is deleted. The rest of TrackOver keeps working on any plan either way.

Can it handle KMZ and KML files?

Yes, in UtilityOps. Upload the design file once and TrackOver redraws it as a map your whole company can read, with bores, handholes, splices and drops sorted by type and layers you can toggle. Crews tap a run to mark it built, and the footage logs itself.

What about per-footage billing?

Estimate and invoice lines are fully custom, so footage rates, vault sets and restoration items price the way your contract reads. Estimates and invoices are Pro and up. Sub crews can be paid per unit too: each sub crew's footage and structures at their own rates for any period, next to what you bill for the same work.

Does it work with bad signal?

Yes. Photos, notes, job status changes, hours and forms save on the phone and send themselves when signal comes back, so a dead spot loses nothing. A cloud icon shows how many items are still waiting. Just do not sign out or delete the app while items are waiting. Some screens still need a signal: estimates, invoices and the office screens load and save online.

We keep our books in QuickBooks. Will this mess with them?

No. The QuickBooks connection starts import-only: TrackOver reads from QuickBooks and never writes, edits or deletes anything there. Sending invoices is off until the owner turns it on and confirms a preview of exactly what will go.

What does it cost?

Plans are per person per month: Pro $25, Premium $45, Elite $69, with a 3-seat minimum. There is also a Free plan with 3 jobs, 30 photos and 3 users that needs no credit card and does not expire. Plans are billed monthly with no annual contract, and you can change them whenever the season changes. UtilityOps is priced separately when it goes on sale.

What happens when the 7-day trial ends?

Nothing is charged, because no card was asked for. If you don't pick a paid plan, the account moves to the free plan and your jobs and photos stay where they are. Paid features go back to showing an upgrade prompt, and the owner or a manager can pick a plan on the Billing page whenever they are ready.

Can someone set it up with me?

Yes. Book a free 30-minute setup call and we set up your company and price list with you, and your first real estimate goes out before we hang up. You can also start on your own, since the app has a getting-set-up checklist, so the call is optional.

Tonight could be different

Try it on one real job: add it, snap some photos, send the invoice, and see if your crew likes it. 7 days free, and your data stays yours either way.

Start your 7-day free trial
  • No card to start
  • Cancel any time, no contract
  • Export your data whenever you want

Want a hand? A real person sets it up with you on a free 30-minute call.

On day 8 nothing is charged, because no card was asked for. Without a paid plan the account moves to Free (3 jobs, 30 photos, 3 users) and what you entered stays.

Free calculators for fiber work:

Free templates for fiber work:

Looking for fiber work or a crew? Free on the work board:

Trade shows for fiber work, from the contractor calendar:

Dig into the tools:

Setup how-tos, step by step:

Comparing software? Fair comparisons, with each tool's own pricing page linked:

Not sure fiber is your fit? Take the 5-question quiz or see plans and pricing.

Related trades:

Other trades we build for: