Ballpark a fiber or utility build: bore, trench, and aerial footage, handholes, and splices, at rates you set. Get a total, a blended cost per foot, and a rough timeline. The rates are placeholders — put your own in.

Item
Quantity
Rate
Cost
Directional bore
ft
$/ft
$12,000
Trench / plow
ft
$/ft
$3,500
Aerial / lash
ft
$/ft
$0
Handholes / vaults
ea
$/ea
$2,400
Splices / terminations
ea
$/ea
$240
Mobilization / permits
$
$2,500
$20,640
estimated total
$14
blended $/ft
1,500 ft
total footage
Rough timeline
5
crew-days (~1 wk)

A planning number, not a bid. Real footage-per-day swings with soil, restoration, mark-out delays, and permits — track your own production for a few weeks and the rate above gets a lot more honest.

Common questions

How much does it cost to install fiber per foot?

It swings hard with method and market. Underground fiber commonly runs on the order of $10 to $25 per foot once you count boring or trenching, restoration, handholes, and splicing — higher in dense urban work with lots of utilities, lower on open rural runs. Aerial (lashing to existing pole) is usually cheaper per foot, often in the single digits, but make-ready and pole rates change the picture. Use the calculator with your own numbers rather than a single national figure.

How much does directional boring cost per foot?

For utility-size HDD, per-foot boring cost depends on diameter, soil, depth, and crossings. Rock, congested corridors, and long shots under highways or rail cost far more than an open bore through clean dirt. Plug your own bore rate into the calculator; that is the number your bids actually live on.

Is aerial or underground fiber cheaper?

Aerial is usually cheaper to place per foot because you are not opening the ground, but it carries pole make-ready, attachment fees, and storm exposure. Underground costs more up front and is far more durable and out of sight. Most real builds are a mix, which is why this tool lets you split footage across bore, trench, and aerial.

How do I estimate a fiber build?

Break it into what you actually price: footage by method (bore, trench, aerial) at your unit rates, then handholes and vaults by the each, splices and terminations by the each, and a flat line for mobilization and permits. Add them up and divide by total footage for a blended cost per foot. That is exactly what this calculator does.

How long does it take to install fiber?

Divide the footage by your crew's honest production rate. A bore crew might place a few hundred feet a day in tough ground and much more in easy dirt; restoration, mark-out waits, and permits eat into it. Track your real feet-per-day over a few weeks and the timeline stops being a guess.

Bidding and building fiber?

TrackOver's FiberOps tracks real production by crew and method, 811 mark-outs, permits, splices, and a bore log — so next time the estimate above comes from your own numbers, not a guess. Plus crew-readable route maps from your KMZ designs and a live build link you can share with the prime.