Practical writing about running a contracting business: documentation, job costing, crews, and getting paid. Worth reading whether or not you ever use our software. Looking for trade shows and key dates? See the contractor calendar.
811 and safety
Locates, markouts, trench safety and keeping the crew out of trouble.
- November 7, 2026 · 6 minute read811 tickets and locates: how contractors keep them tied to the jobHow excavation and utility contractors keep 811 ticket numbers, locate marks and photos on the job, so the crew knows what is marked before digging.Read it →
- November 4, 2026 · 6 minute readSloping, shoring, or a trench box? When a trench needs protectionWhen OSHA requires a protective system in a trench, how soil type sets the slope, and how to choose between sloping, shoring, and a trench box.Read it →
- November 4, 2026 · 5 minute readA markout is about to expire: what to do before anyone digsA step-by-step plan for an 811 markout that is about to expire or has expired: when to stop, how to renew, and what to record on the job.Read it →
- July 14, 2026 · 5 minute readMarkouts expire: managing the 811 clock across every open jobUtility markouts are only valid for a window, and every state sets its own. How dirt contractors keep locate tickets current across a busy schedule.Read it →
- November 19, 2026 · 6 minute readWhat is an EMR? The experience mod, explained for dirt contractorsWhat an EMR is, how the workers' comp experience mod is calculated in general terms, why GCs ask for it, and what an excavation company can do about it.Read it →
- July 20, 2026 · 6 minute read25 toolbox talk topics for dirt crews, and how to actually run themA working list of 5-minute toolbox talk topics for excavation, utility and sitework crews, by season, plus how to run a talk crews don't hate.Read it →
Estimating and bidding
Pricing the work, writing the quote and winning it without losing money.
- November 15, 2026 · 7 minute readIs your dig job running over? Track yards hauled against yards bidHow to count loads on site, turn them into yards, check them against the bid every day, and what to do the day you see you are running over.Read it →
- November 12, 2026 · 6 minute readEstimating trench quantities: excavation, bedding, backfill, and haul-offHow to estimate trench quantities: cubic yards, sloped walls, swell and shrink, bedding and backfill minus the pipe, spoil to haul, and a worked example.Read it →
- November 11, 2026 · 6 minute readHow to bid a septic installationA bidding method for septic installers: site visit, dig quantities, stone and sand, permits and inspections, and the extras that wreck margin.Read it →
- November 11, 2026 · 5 minute readExcavation cost per cubic yard: how to price itExcavation cost and dirt work cost per cubic yard: why quotes disagree, and how to build your own from yards, swell, trucks, disposal and markup.Read it →
- November 11, 2026 · 6 minute readExcavator rate per hour with an operator: how to set yoursExcavator rate per hour with an operator: build yours from machine cost, loaded labor, overhead and profit, with a made-up worked example and minimums.Read it →
- November 9, 2026 · 6 minute readFiguring overhead and markup for an excavation companyHow an excavation company can figure overhead, spread it across jobs, and set markup: direct cost vs overhead, markup vs margin, and a worked example.Read it →
- October 29, 2026 · 6 minute readHow to price utility trenching per foot (and check it against your hourly cost)Build a per-foot price for trenching and pipe or conduit installs from crew cost, production rate, materials, restoration and overhead.Read it →
- October 9, 2026 · 6 minute readHow many trucks does an excavator need? Balancing trucks to the loaderThe formula for matching trucks to an excavator: truck cycle time divided by load time, with a worked example and what happens when you run short or over.Read it →
- October 8, 2026 · 6 minute readExcavation estimating software: features that matter and ones that do notHow to choose excavation estimating software: saved pricing, quantities, quick quotes from the phone, estimate to job to invoice, and what you can skip.Read it →
- October 7, 2026 · 6 minute readHow to price dump truck loads and haul-off on excavation jobsHow to price dump truck loads: per load, per hour or per ton, using cycle time, swell, dump fees, wait time and minimums, with a made-up worked example.Read it →
- July 20, 2026 · 7 minute readHow to bid excavation jobs and dirt work without guessingHow to bid excavation jobs, excavation work and dirt work jobs: site visit checklist, production rates, the costs everyone forgets, and pricing risk.Read it →
- November 16, 2026 · 6 minute readGetting on a GC's bid list: the prequalification packet for excavation subsWhat general contractors ask excavation subs for before adding them to a bid list, how to keep a prequal packet ready, and how to follow up on bids.Read it →
- November 11, 2026 · 6 minute readRock clause for an excavation contract, with example languageRock clause example for an excavation contract: sample wording for rock and unsuitable soil, how to document what you hit, and the signed change order.Read it →
- November 4, 2026 · 6 minute readHow to spot a job going over its quote while you can still fix itA simple way to watch budget burn on each dirt job: why spent against quote is not enough, how to measure progress, and when to act.Read it →
- July 20, 2026 · 5 minute readT&M or fixed price? How dirt contractors should chooseTime and material tickets, and when T&M beats a fixed price for excavation and sitework, plus the hybrid most dirt contractors should use more often.Read it →
- July 14, 2026 · 5 minute readHow many yards fit in a dump truck? Less than the box saysReal dump truck capacities by type, why weight limits beat box volume for stone and dirt, and how to figure loads for your own truck.Read it →
Getting paid
Invoices, deposits, change orders and cash flow.
- November 23, 2026 · 6 minute readGetting through the winter slow season: cash flow for excavation companiesGetting an excavation company through winter: a monthly cash forecast, collecting before the freeze, a credit line, winter work, and keeping key people.Read it →
- November 11, 2026 · 6 minute readHow septic companies can get paid fasterHow septic installers shorten the wait for money: deposits, invoicing on site, card and bank pay, and service reminders.Read it →
- November 10, 2026 · 6 minute readChange orders on dirt jobs: how to price, write, and get extra work approvedHow excavation contractors handle extra work: what triggers a change order, how to price it, what to write down on site, and how to get it signed.Read it →
- November 6, 2026 · 6 minute readDeposits and progress billing for excavation jobs: get paid before you are out of pocketHow small dirt contractors use deposits, milestone billing and monthly progress invoices so they don't finance the customer's job, with sample wording.Read it →
- October 15, 2026 · 6 minute readGetting paid faster: an invoicing routine for small contractorsAn invoicing routine for small contractors: bill the day work ends, use deposits and progress billing, attach backup, know lien deadlines.Read it →
- October 8, 2026 · 6 minute readExcavation invoicing software: what to look for before you buyExcavation invoicing software checklist: hourly, per-load and lump-sum line items, photo backup, progress billing, online payment and phone use.Read it →
- November 4, 2026 · 5 minute readKeep one running change order log for every jobA simple change order log for each excavation job: what each row should hold, how status moves from sent to approved, and how to find unbilled extra work.Read it →
- November 4, 2026 · 5 minute readInvoice the day the job is done, not at the end of the monthWhy invoicing on completion day gets dirt contractors paid sooner, what to check first, and how to send the invoice with photos and a pay link.Read it →
- November 4, 2026 · 6 minute readWhat retainage is and how excavation contractors track itRetainage is money held back from each progress payment until the work is signed off. What to ask before you sign and how to track what is still held.Read it →
- October 8, 2026 · 6 minute readSnow plow invoicing app: how to bill per push, per storm, or per seasonHow snow contractors can bill per push, per storm or by season, keep proof for each property, and pick an invoicing app that works from the truck.Read it →
Crew, time and equipment
Hours, payroll, hiring, machines and what each job really costs.
- November 15, 2026 · 8 minute readWhat excavation software costs in 2026 (with crew-size examples)How excavation software is priced (per user, flat, seat minimums, annual, add-ons), with dated prices for a 3, 5 and 10 person crew.Read it →
- November 7, 2026 · 6 minute readHow to track job costs on excavation jobs without spreadsheetsHow excavation contractors track crew hours, machine hours, materials and change orders on each job without a spreadsheet, and what to check in software.Read it →
- November 2, 2026 · 6 minute readShould an excavation company add snow plowing? What to weigh firstAdding snow plowing as winter work for a dirt company: equipment you own vs need, insurance, contract types, staffing, cash, and route density.Read it →
- October 1, 2026 · 7 minute readWinter excavation work: getting your company ready before the ground freezesWinter excavation work: what to finish in October and November, why not to fill on frozen ground, winterizing machines, cash planning and spring bookings.Read it →
- November 5, 2026 · 6 minute readHow to track crew hours without paper timesheetsWhy paper timesheets cost dirt contractors money, what the Department of Labor expects in time records, and a simple way to move a crew to phone time.Read it →
- November 4, 2026 · 6 minute readLawn care software: what to look for before you leave the route sheetWhat lawn care and mowing companies should check in route software: weekly and biweekly schedules, a log of every cut, photo proof, and month-end billing.Read it →
- November 4, 2026 · 6 minute readSnow plowing software: what to look for in a plow business appWhat snow plowing companies should check in software: property records, routes, timestamped proof at each stop, crew time, and per-push billing.Read it →
- November 4, 2026 · 5 minute readThe five time flags to clear before you run crew payrollBefore payroll, check each crew member's week for missed clock-outs, days over 12 hours, overtime, shifts with no job and edits made after the week locked.Read it →
- October 28, 2026 · 6 minute readHiring your first foreman: what changes when you're not on every jobHiring or promoting your first foreman in a dirt company: what to delegate, decision rights, daily reports, training, pay, and signs it works.Read it →
- October 26, 2026 · 6 minute readWhat to get in writing before you mobilize as a subcontractorWhat excavation and utility subs should get in writing before mobilizing: scope, exclusions, pay-if-paid terms, retainage, backcharges, and change orders.Read it →
- October 20, 2026 · 6 minute readRent or buy equipment? The utilization math that decides itShould a dirt contractor rent or buy a machine? Compare owning cost per hour with rental, find the break-even hours, and know when renting wins.Read it →
- October 12, 2026 · 6 minute readScheduling dirt work around the weather without losing the weekA rain-day policy for dirt contractors: what work can run wet and what cannot, building float into the schedule, and telling customers about reschedules.Read it →
- October 8, 2026 · 6 minute readPaving job management software: scheduling crews, tracking tons, and getting paidWhat paving and sealcoating contractors need from job software: scheduling, tons and square feet, photos, estimates, invoices, and crew time on one app.Read it →
- July 14, 2026 · 7 minute readWhy some dirt jobs lose money and nobody noticesJob costing for excavation and dirt-work contractors, in plain language: what to track, what it tells you, and the three leaks it usually finds.Read it →
- July 14, 2026 · 5 minute readThe five-minute habit that keeps machines off the trailerEquipment maintenance tracking for dirt contractors: hour-based service intervals, who logs what, and why breakdowns cluster in your busiest week.Read it →
Photos, tickets and as-builts
What to document on the job so nobody argues about it later.
- November 11, 2026 · 6 minute readWhat to photograph on a septic install for the inspectorA septic install shot list: tank set, inlet and outlet, baffles, distribution box, laterals before backfill and setbacks, plus GPS and timestamp tips.Read it →
- November 11, 2026 · 6 minute readWhat to put in an excavation daily reportA plain checklist for an excavation daily report: crew, machines, quantities, weather, delays, visitors and photos, kept short enough to finish.Read it →
- November 11, 2026 · 6 minute readSeptic inspections at home sale in NJ and PA: get paidWhat NJ and PA septic companies need in a home-sale inspection report, how to document it, and how to bill the realtor or seller and get paid.Read it →
- November 4, 2026 · 6 minute readHaul ticket disputes: what records settle a disagreement about the countWhen a hauler or customer disputes a load count, the scale ticket, its photo and a matched log decide it. Build that record before the argument.Read it →
- October 8, 2026 · 6 minute readFiber as-built software: how to hand off clean records without the paperwork pileWhat fiber and utility crews need from as-built software: marked-up routes, footage, GPS photos, depth of cover, and a closeout a prime accepts.Read it →
- July 14, 2026 · 6 minute readWhat to document on every dirt job, before the dispute finds youThe photos, tickets, and sign-offs that end arguments before they start. A working documentation checklist for excavation and underground contractors.Read it →
Keep the job, the photos and the invoice in one place
TrackOver is job tracking for excavation, utility, paving, snow and lawn crews. Try everything free for 7 days.
- No card to start
- Cancel any time, no contract
- Export your data whenever you want