Free tool

Pond excavation calculator

Dig volume from pond size. Enter the surface length and width and the AVERAGE depth in inches (a pond with sloped sides averages roughly half its maximum depth; a 3:1-sloped swimming pond a bit more).

37.04
cubic yards
50
tons (approx.)
3
truckloads at 16 yd³

Pro habit: Plan hauling around 40.7 yd³ loose; excavated soil swells 20 to 30 percent, and pond spoil is often wet, which adds weight per load.

This is a box-volume estimate off average depth. Sloped sides, shelves, and berm construction change the real number, so treat it as an order-of-magnitude for bidding, then shoot grades on site. Weights are common industry approximations; confirm with your supplier before ordering.

More free calculators:

DirtMulchGravelSandAsphaltTopsoilConcreteFill DirtLimestoneRiprapPaver BaseTrenchFrench Drain
Doing this for a living?

TrackOver runs dirt-work companies: jobs, crews, stamped site photos, machine hours, and billing in one place. Built inside a working excavation company.

Find your tradeSee a demo

Common questions

How do I calculate how much pond dig I need?

Multiply length by width by depth in feet, then divide by 27 to get cubic yards. This pond dig calculator does it for you: enter length and width in feet and depth in inches, and it returns cubic yards, estimated tons, and truckloads. Add about 10 percent for compaction, spillage, and uneven grade.

How many tons is a cubic yard of pond dig?

Pond Dig runs roughly 1.35 tons per cubic yard as a common industry approximation (Excavated material (bank soil) at about 2,700 lb/yd³). Moisture and material change this, so confirm the exact conversion with your supplier.

Is this pond dig calculator free?

Yes. It is a free tool from TrackOver, software built inside a working excavation company for contractors who move dirt. No signup required to use it.