Skip to content

Free tool

Equipment cost per hour calculator

Owning plus operating cost per machine hour, with and without the operator.

Owning the machine
Running the machine
$30.59
per machine hour
$62.59
with the operator
$11.93
owning, per hour
$18.67
fuel and upkeep, per hour
$8,333
depreciation per year
$27,533
machine cost per year

Depreciation a year = (price - resale) / years. Owning per hour = (depreciation + insurance + other) / hours a year. Fuel per hour = gallons x price. Upkeep per hour = yearly service / hours a year. Machine per hour = owning + fuel + upkeep.

The starting numbers are examples to show the math, not prices or averages for any machine. Type your own purchase price, resale value, hours, fuel and bills.

More free calculators:

Turn this number into an estimate
TrackOver turns it into the estimate, the schedule and the invoice. 7-day free trial, no card needed.
Try TrackOver freeSee it first, no signup
How do you figure equipment cost per hour? Add a year of ownership costs (depreciation, insurance, interest, storage) and divide by the hours the machine really works in a year. Add the operating cost for each hour: fuel burned, plus a year of service, wear parts and repairs divided by those same hours. The total is your cost per machine hour.

When to use it

Use it when you are pricing machine time in a bid, deciding whether to rent or buy, or checking that your hourly rate covers what the machine costs you.

How to measure on site

  1. Pull the purchase price from the bill of sale, and look up what the same model with the hours you expect to have sells for to set the resale value.
  2. Read the meter hours from last year, or use a realistic number for the hours it will work. Do not use the hours in a work year.
  3. Add up last year's service, wear parts and repair bills, the insurance bill and the fuel the machine burns in a working hour.
Worked example (example figures only): $85,000 machine, $35,000 resale, 6 years, 900 hours a year
  • Depreciation a year: ($85,000 - $35,000) / 6 = $8,333.33.
  • Ownership a year: $8,333.33 + $2,400 insurance = $10,733.33. Per hour: / 900 = $11.93.
  • Fuel per hour: 3 gal x $4.00 = $12.00.
  • Maintenance per hour: $6,000 / 900 = $6.67.
  • Machine per hour: $11.93 + $12.00 + $6.67 = $30.59. With a $32.00 operator: $62.59.
  • Same machine at 600 hours a year: $39.89 per hour, because the ownership costs spread over fewer hours.

Common questions

How do you figure equipment cost per hour?

Add a year of ownership costs (depreciation, insurance, interest, storage) and divide by the hours the machine really works in a year. Add the operating cost for each hour: fuel burned, plus a year of service, wear parts and repairs divided by those same hours. The total is your cost per machine hour.

How do you figure depreciation on a machine?

Take what you paid, subtract what you expect to sell it for at the end, and divide by the years you plan to keep it. The resale value is your own estimate. Check what similar machines with the same hours are selling for before you trust it.

Why does the cost per hour go up when the machine works fewer hours?

Depreciation and insurance run whether the machine works or sits on the trailer. Spread over fewer hours, each hour carries more of them. Try the same numbers at 600 hours and at 1,000 hours a year and watch the ownership line move.

Should the operator be in the machine rate?

Either way works if you stay consistent. This tool shows the machine rate and the rate with the operator wage, so you can bill machine and labor on separate lines or together. If you add payroll taxes and benefits to the wage, type the full hourly figure.

I paid off the machine. Do I still count it?

Yes. A paid-off machine still burns fuel, wears out and heads toward replacement. Use what it would cost to replace it, or what it would sell for today, so the rate pays for the next machine.

Is this the same as a rental rate?

No. A rental rate carries the rental company's overhead, profit and risk. This is what the machine costs you. It is a good floor for a bid, and a rental rate is a good check against it.

Pricing machine time?

TrackOver keeps the estimate, the equipment, the crew schedule and the job costs in one place, from the first quote to the final invoice.

Try TrackOver free

7-day free trial, no card needed. See it in 2 minutes

Start your trial with your trade set up:

Want the details first? See how TrackOver runs the job for Excavation, Grading & Clearing, Trucking & Hauling and Drilling & Boring.