Mobilization

What is mobilization?

Mobilization is the cost of getting to work before the work starts: loading and hauling machines to the site, crew travel, setup, and permits. It's a real cost of every job and belongs in every bid, either as its own line or built into the price.

A tri-axle and a lowboy don't move for free. Neither does the hour spent loading, chaining, unloading, and walking the machine to the back of the site. On a two-week job that cost disappears into the total; on a one-day job it can be a third of the real cost, which is why small jobs priced like big ones lose money.

What to include

  • Trucking the equipment in and out (both directions, every mobilization)
  • Load, unload, and setup time
  • Permits, markout coordination, and pre-job walkthroughs
  • Re-mobilization when a job pauses for an inspection, other trades, or weather

Line item or built in?

Commercial work usually shows mobilization as its own line, and re-mobilization language protects you when the schedule slips. Residential customers sometimes read a "mobilization" line as a junk fee, so many contractors build it into the price instead. Either is fine; forgetting it is not.

Related
More from the dirt world
As-built811 / One CallMarkout colorsSpoil vs. fillBank vs. loose yardsMarkoutRock clauseCompactionAll terms →

TrackOver keeps the as-builts, markout tickets, hours, and job costs this page talks about. See how it works.