Franklin Telephone Company BEAD awards
Franklin Telephone Company won $7.7 million in BEAD grants to serve 1,525 locations in Mississippi, according to the state award lists below. These are wired builds, which means construction: placement, boring, splicing and drops.
Mississippi
$7.7 million
Listed as FRANKLIN TELEPHONE COMPANY, INC. · 1,525 locations · Fiber · provider match $3.7 million · est. completion July 25, 2028 · about 142 mi buried fiber (state estimate)
Source: Mississippi BEAM, BEAD Final Proposal Exhibits A-E (version approved by NIST) (NIST approved 2026-06-30)
BEAD grants
$7.7 million
Locations
1,525
Grant per location
$5,059
Fiber miles (est.)
142 buried · 0 aerial
Latest completion
July 25, 2028
What this build needs from crews
- Underground, about 142 miles. Directional boring, plowing or trenching, conduit and handholes, then restoration. Locates come first on every foot (utility locating).
- Splicing and drops. Every one of the 1,525 locations needs a drop and a splice at the end (fiber splicing).
How subs usually get on a BEAD build
- Find out who is building. Providers often hand construction to a prime or an engineering and construction firm, and those firms hire the subs.
- Get your paperwork ready before you call: certificate of insurance, W-9, safety program, and proof you can do the footage.
- Ask what the state's BEAD rules mean for subs. Workforce, safety and reporting requirements vary by state and are often passed down.
- Be findable. List your crew with the states and trades you cover, and watch fiber work on the board.
Other wired BEAD winners in Mississippi
Want to build for Franklin Telephone Company?
Providers and their primes staff these builds with subcontractors. List your crew with the states and trades you cover so they can find you. Free.
Provisional awards can change as states finalize agreements. TrackOver isn't affiliated with Franklin Telephone Company. All providers.