Skip to content

What public jobs pay per foot

Florida DOT paid an average of $36.38 per foot for conduit placed by directional bore across 169 contracts (Aug 2025 to Jul 2026), and $17.53 per foot for conduit in open trench. These are winning prime contractor prices with material included, straight from the state's published bid data. A sub working under a prime usually sees less.

Pulled September 24, 2026. Florida figures are FDOT's own quantity-weighted statewide averages; New Jersey figures are NJDOT's averages over 89 contracts awarded July 2022 to June 2023, the newest it has posted; Oregon figures are the median low bid per contract.

Fiber and conduit

ItemLatestEarlier (contracts)State
Conduit by directional bore
FDOT 0630 2 12: conduit, furnish & install, directional bore
$36.38 per foot
Aug 2025 to Jul 2026, 169 contracts
2025: $41.81 (194)
2024: $41.76 (213)
Florida
Conduit in open trench
FDOT 0630 2 11: conduit, furnish & install, open trench
$17.53 per foot
Aug 2025 to Jul 2026, 159 contracts
2025: $18.04 (194)
2024: $17.24 (196)
Florida
Fiber cable pulled underground, 2 to 12 fibers
FDOT 0633 1121: fiber optic cable, f&i, underground,2-12 fibers
$4.54 per foot
Aug 2025 to Jul 2026, 53 contracts
2025: $5.01 (59)
2024: $4.74 (48)
Florida
Fiber cable pulled underground, 97 to 144 fibers
FDOT 0633 1124: fiber optic cable, f&i, underground, 97 - 144 fibers
$5.89 per foot
Aug 2025 to Jul 2026, 17 contracts
2025: $5.92 (24)
2024: $6.17 (11)
Florida
Fiber splice
FDOT 0633 2 31: fiber optic connection, install, splice
$57.44 each
Aug 2025 to Jul 2026, 66 contracts
2025: $62.01 (72)
2024: $61.30 (72)
Florida
Fiber termination
FDOT 0633 2 32: fiber optic connection, install, termination
$99.96 each
Aug 2025 to Jul 2026, 38 contracts
2025: $104.17 (43)
2024: $101.58 (40)
Florida
Pull and splice box, 13 x 24 in. cover
FDOT 0635 2 11: pull & splice box, f&i, 13" x 24" cover size
$1,497 each
Aug 2025 to Jul 2026, 168 contracts
2025: $1,622 (206)
2024: $1,631 (219)
Florida
Pull and splice box, 24 x 36 in. cover
FDOT 0635 2 12: pull & splice box, f&i, 24" x 36" cover size
$2,827 each
Aug 2025 to Jul 2026, 80 contracts
2025: $3,168 (92)
2024: $3,031 (103)
Florida
ITS conduit, type A
NJDOT 704002M: its conduit, type a
$55.31 per foot
Jul 2022 to Jun 2023, 7 contracts
Only one period publishedNew Jersey
3 in. rigid metallic conduit
NJDOT 701021P: 3" rigid metallic conduit
$85.26 per foot
Jul 2022 to Jun 2023, 15 contracts
Only one period publishedNew Jersey
Junction box, 18 x 36 in.
NJDOT 701102M: 18" x 36" junction box
$5,231 each
Jul 2022 to Jun 2023, 13 contracts
Only one period publishedNew Jersey

On the board: Directional drilling · Underground fiber · Fiber splicing

Water and sewer

ItemLatestEarlier (contracts)State
12 in. ductile iron water pipe, 5 ft deep
ODOT: 12 inch ductile iron pipe, 5 ft depth
$252.50 per foot
2025, 6 contracts, middle half $174.25 to $342.50
2024: $227.50 (10)
Oregon

On the board: Water and sewer mains

Site work

ItemLatestEarlier (contracts)State
Clearing and grubbing
FDOT 0110 1 1: clearing & grubbing
$53,171 per acre
Aug 2025 to Jul 2026, 217 contracts
2025: $47,529 (261)
2024: $53,173 (275)
Florida
Clearing and grubbing
ODOT: clearing and grubbing
$29,948 per acre
2025, 42 contracts, middle half $9,904 to $60,750
2024: $29,250 (44)
Oregon
Unclassified excavation
NJDOT 202009P: excavation, unclassified
$34.24 per cubic yard
Jul 2022 to Jun 2023, 20 contracts
Only one period publishedNew Jersey

On the board: Land clearing · Excavation

Paving and concrete

ItemLatestEarlier (contracts)State
Superpave asphalt, traffic level C
FDOT 0334 1 13: superpave asphaltic conc, traffic c
$139.02 per ton
Aug 2025 to Jul 2026, 87 contracts
2025: $146.08 (103)
2024: $155.42 (111)
Florida
Milling asphalt, 1.5 in. average depth
FDOT 0327 70 6: milling existing asphalt pavement, 1 1/2" avg depth
$2.73 per square yard
Aug 2025 to Jul 2026, 177 contracts
2025: $3.06 (216)
2024: $3.52 (188)
Florida
Concrete sidewalk and driveway, 4 in.
FDOT 0522 1: concrete sidewalk and driveways, 4" thick
$67.65 per square yard
Aug 2025 to Jul 2026, 122 contracts
2025: $68.76 (156)
2024: $74.51 (189)
Florida
Concrete sidewalk and driveway, 6 in.
FDOT 0522 2: concrete sidewalk and driveways, 6" thick
$94.65 per square yard
Aug 2025 to Jul 2026, 162 contracts
2025: $104.10 (194)
2024: $98.39 (216)
Florida
Concrete curb and gutter, type F
FDOT 0520 1 10: concrete curb & gutter, type f
$37.85 per foot
Aug 2025 to Jul 2026, 139 contracts
2025: $44.72 (161)
2024: $45.83 (190)
Florida
Concrete curb and gutter
ODOT: concrete curbs, curb and gutter
$55.00 per foot
2025, 21 contracts, middle half $43.50 to $60.50
2024: $50.00 (30)
Oregon
Commercial asphalt concrete pavement
ODOT: commercial asphalt concrete pavement
$360.00 per ton
2025, 7 contracts, middle half $320.00 to $555.20
2024: $335.00 (6)
Oregon
Hot mix asphalt 12.5M64 surface course
NJDOT 401054M: hot mix asphalt 12.5 m 64 surface course
$106.21 per ton
Jul 2022 to Jun 2023, 25 contracts
Only one period publishedNew Jersey
Hot mix asphalt 25M64 base course
NJDOT 401099M: hot mix asphalt 25 m 64 base course
$120.61 per ton
Jul 2022 to Jun 2023, 19 contracts
Only one period publishedNew Jersey
Milling asphalt, 3 in. or less
NJDOT 401009P: hma milling, 3" or less
$2.84 per square yard
Jul 2022 to Jun 2023, 29 contracts
Only one period publishedNew Jersey
Concrete sidewalk, 4 in.
NJDOT 606012P: concrete sidewalk, 4" thick
$109.89 per square yard
Jul 2022 to Jun 2023, 27 contracts
Only one period publishedNew Jersey
Concrete vertical curb, 9 x 16 in.
NJDOT 607018P: 9" x 16" concrete vertical curb
$61.13 per foot
Jul 2022 to Jun 2023, 32 contracts
Only one period publishedNew Jersey

On the board: Paving · Concrete

Reading these numbers

  • Whose price it is. The state paid these to the prime. They carry the prime's overhead and bonding, and on Florida items the material too.
  • What moves it. Rock, bore length, conduit size and count, access, restoration and how much footage a crew can make in a day.
  • Averages hide the spread. Oregon's middle half for clearing and grubbing runs from about $10,000 to $61,000 an acre. Price the job in front of you, not the average.
  • Check your own work. The bore calculator and fiber cost calculator build a number from your crew's own costs.

How much does directional boring cost per foot?

On Florida DOT jobs from Aug 2025 to Jul 2026, conduit placed by directional bore averaged $36.38 per foot across 169 contracts, with the conduit included. That is the prime contractor's winning price to the state. A sub boring for a prime usually gets less, and rock, bore length, conduit size and count, and how many shots a day the crew can make move the number a lot.

Is trenching cheaper than boring?

On the same Florida DOT jobs, conduit in open trench averaged $17.53 per foot against $36.38 bored. Trenching needs room to open the ground and pay for restoration, which is why roads, driveways and sidewalks usually get bored.

Why are these numbers higher than what subs get paid?

They are the prices the state paid the prime contractor. They include the prime's overhead, bonding, traffic control on some items, and often the materials. A sub quoting labor and equipment only should expect a lower figure, and a sub who also buys the conduit should expect it closer to these.

Paying or getting paid by the foot?

Post the work with the rate in the units it's paid in, per foot, per splice or per box, and crews that cover the area get it in their daily email.

Post workFind work

Sources: Florida DOT, Item Average Unit Cost (statewide) (contract type CC), New Jersey DOT, Estimation Support and Historical Statistics (Jul 2022 to Jun 2023, 89 contracts) and Oregon DOT, bid data by year (low bids). Items with fewer than 5 contracts in a period are left out. The agencies publish these for estimating and don't vouch for any single figure.