Trico Electric Cooperative BEAD awards

Trico Electric Cooperative won $19.7 million in BEAD grants to serve 8,444 locations in Arizona, according to the state award lists below. These are wired builds, which means construction: placement, boring, splicing and drops.

Arizona
$19.7 million
Listed as Trico Electric Cooperative, Inc. · 8,444 locations · Fiber · provider match $49.1 million · est. completion February 1, 2028 · about 483 mi buried + 365 mi aerial fiber (state estimate)
Pima
BEAD grants
$19.7 million
Locations
8,444
Grant per location
$2,331
Fiber miles (est.)
483 buried · 365 aerial
Latest completion
February 1, 2028

What this build needs from crews

How subs usually get on a BEAD build

  1. Find out who is building. Providers often hand construction to a prime or an engineering and construction firm, and those firms hire the subs.
  2. Get your paperwork ready before you call: certificate of insurance, W-9, safety program, and proof you can do the footage.
  3. Ask what the state's BEAD rules mean for subs. Workforce, safety and reporting requirements vary by state and are often passed down.
  4. Be findable. List your crew with the states and trades you cover, and watch fiber work on the board.

Other wired BEAD winners in Arizona

WecomAZ · $195.8 millionNavajo NationAZ · $148.6 millionTransWorld NetworkAZ · $23.5 millionComcastAZ · $13.6 millionTohono O'odham Utility AuthorityAZ · $7.0 millionMediacomAZ · $5.8 million
Want to build for Trico Electric Cooperative?

Providers and their primes staff these builds with subcontractors. List your crew with the states and trades you cover so they can find you. Free.

List your crewFiber work on the board

Provisional awards can change as states finalize agreements. TrackOver isn't affiliated with Trico Electric Cooperative. All providers.