Midwest Data Center BEAD awards
Midwest Data Center won $1.4 million in BEAD grants to serve 686 locations in Missouri and Iowa, according to the state award lists below. These are wired builds, which means construction: placement, boring, splicing and drops.
Iowa
$908,973
Listed as Midwest Data Center, Inc. · 589 locations · Fiber · provider match $302,991 · est. completion December 10, 2029 · about 319 mi buried fiber (state estimate)
Source: Iowa Department of Management, Broadband Office: BEAD Final Proposal files (approved) (approved 2025-11-24)
Missouri
$477,241
Listed as Midwest Data Center, Inc · 97 locations · Fiber · provider match $531,083 · est. completion November 30, 2028 · about 23 mi buried fiber (state estimate)
Source: Missouri Office of Broadband Development, BEAD Final Proposal data files (files posted 2025-09)
BEAD grants
$1.4 million
Locations
686
Grant per location
$2,021
Fiber miles (est.)
342 buried · 0 aerial
Latest completion
December 10, 2029
What this build needs from crews
- Underground, about 342 miles. Directional boring, plowing or trenching, conduit and handholes, then restoration. Locates come first on every foot (utility locating).
- Splicing and drops. Every one of the 686 locations needs a drop and a splice at the end (fiber splicing).
How subs usually get on a BEAD build
- Find out who is building. Providers often hand construction to a prime or an engineering and construction firm, and those firms hire the subs.
- Get your paperwork ready before you call: certificate of insurance, W-9, safety program, and proof you can do the footage.
- Ask what the state's BEAD rules mean for subs. Workforce, safety and reporting requirements vary by state and are often passed down.
- Be findable. List your crew with the states and trades you cover, and watch fiber work on the board.
Other wired BEAD winners in the same states
Want to build for Midwest Data Center?
Providers and their primes staff these builds with subcontractors. List your crew with the states and trades you cover so they can find you. Free.
Provisional awards can change as states finalize agreements. TrackOver isn't affiliated with Midwest Data Center. All providers.