Skip to content

Stimulus Technologies BEAD awards

Stimulus Technologies won $41.1 million in BEAD grants to serve 4,652 locations in Missouri, according to the state award lists below. These are wired builds, which means construction: placement, boring, splicing and drops.

Missouri
$41.1 million
4,652 locations · Fiber · provider match $16.0 million · est. completion December 2, 2028 · about 73 mi buried + 653 mi aerial fiber (state estimate)
BEAD grants
$41.1 million
Locations
4,652
Grant per location
$8,830
Fiber miles (est.)
73 buried · 653 aerial
Latest completion
December 2, 2028

What this build needs from crews

How subs usually get on a BEAD build

  1. Find out who is building. Providers often hand construction to a prime or an engineering and construction firm, and those firms hire the subs.
  2. Get your paperwork ready before you call: certificate of insurance, W-9, safety program, and proof you can do the footage.
  3. Ask what the state's BEAD rules mean for subs. Workforce, safety and reporting requirements vary by state and are often passed down.
  4. Be findable. List your crew with the states and trades you cover, and watch fiber work on the board.

Other wired BEAD winners in Missouri

BrightspeedMO · $117.3 millionConexon ConnectMO · $64.6 millionSte Rural BroadbandMO · $51.6 millionHometown InternetMO · $47.4 millionNet Vision CommunicationsMO · $43.1 millionCurrentMO · $41.6 millionSpectrumMO · $39.6 millionSocket TelecomMO · $35.9 million
Want to build for Stimulus Technologies?

Providers and their primes staff these builds with subcontractors. List your crew with the states and trades you cover so they can find you. Free.

List your crewFiber work on the board

Provisional awards can change as states finalize agreements. TrackOver isn't affiliated with Stimulus Technologies. All providers.