KC Fiber BEAD awards
KC Fiber won $202,500 in BEAD grants to serve 31 locations in Missouri, according to the state award lists below. These are wired builds, which means construction: placement, boring, splicing and drops.
Missouri
$202,500
31 locations · Fiber · provider match $67,500 · est. completion December 31, 2026 · about 2 mi buried fiber (state estimate)
Source: Missouri Office of Broadband Development, BEAD Final Proposal data files (files posted 2025-09)
BEAD grants
$202,500
Locations
31
Grant per location
$6,532
Fiber miles (est.)
2 buried · 0 aerial
Latest completion
December 31, 2026
What this build needs from crews
- Underground, about 2 miles. Directional boring, plowing or trenching, conduit and handholes, then restoration. Locates come first on every foot (utility locating).
- Splicing and drops. Every one of the 31 locations needs a drop and a splice at the end (fiber splicing).
How subs usually get on a BEAD build
- Find out who is building. Providers often hand construction to a prime or an engineering and construction firm, and those firms hire the subs.
- Get your paperwork ready before you call: certificate of insurance, W-9, safety program, and proof you can do the footage.
- Ask what the state's BEAD rules mean for subs. Workforce, safety and reporting requirements vary by state and are often passed down.
- Be findable. List your crew with the states and trades you cover, and watch fiber work on the board.
Other wired BEAD winners in Missouri
Want to build for KC Fiber?
Providers and their primes staff these builds with subcontractors. List your crew with the states and trades you cover so they can find you. Free.
Provisional awards can change as states finalize agreements. TrackOver isn't affiliated with KC Fiber. All providers.