Frontier West Virginia BEAD awards
Frontier West Virginia won $186.4 million in BEAD grants to serve 24,253 locations in West Virginia, according to the state award lists below. These are wired builds, which means construction: placement, boring, splicing and drops.
West Virginia
$186.4 million
Listed as Frontier West Virginia Inc. · 24,253 locations · Fiber · provider match $94.2 million · est. completion February 15, 2030 · about 657 mi buried + 3,039 mi aerial fiber (state estimate)
BEAD grants
$186.4 million
Locations
24,253
Grant per location
$7,687
Fiber miles (est.)
657 buried · 3,039 aerial
Latest completion
February 15, 2030
What this build needs from crews
- Underground, about 657 miles. Directional boring, plowing or trenching, conduit and handholes, then restoration. Locates come first on every foot (utility locating).
- Aerial, about 3,039 miles. Make-ready, strand and lash, and pole attachments (aerial fiber), usually with traffic control on the road.
- Splicing and drops. Every one of the 24,253 locations needs a drop and a splice at the end (fiber splicing).
How subs usually get on a BEAD build
- Find out who is building. Providers often hand construction to a prime or an engineering and construction firm, and those firms hire the subs.
- Get your paperwork ready before you call: certificate of insurance, W-9, safety program, and proof you can do the footage.
- Ask what the state's BEAD rules mean for subs. Workforce, safety and reporting requirements vary by state and are often passed down.
- Be findable. List your crew with the states and trades you cover, and watch fiber work on the board.
Other wired BEAD winners in West Virginia
Want to build for Frontier West Virginia?
Providers and their primes staff these builds with subcontractors. List your crew with the states and trades you cover so they can find you. Free.
Provisional awards can change as states finalize agreements. TrackOver isn't affiliated with Frontier West Virginia. All providers.