Citynet BEAD awards

Citynet won $194.7 million in BEAD grants to serve 26,255 locations in West Virginia, according to the state award lists below. These are wired builds, which means construction: placement, boring, splicing and drops.

West Virginia
$194.7 million
Listed as Citynet LLC · 26,255 locations · Fiber · provider match $36.1 million · est. completion February 15, 2030 · about 5,839 mi aerial fiber (state estimate)
BEAD grants
$194.7 million
Locations
26,255
Grant per location
$7,416
Fiber miles (est.)
0 buried · 5,839 aerial
Latest completion
February 15, 2030

What this build needs from crews

  • Aerial, about 5,839 miles. Make-ready, strand and lash, and pole attachments (aerial fiber), usually with traffic control on the road.
  • Splicing and drops. Every one of the 26,255 locations needs a drop and a splice at the end (fiber splicing).

How subs usually get on a BEAD build

  1. Find out who is building. Providers often hand construction to a prime or an engineering and construction firm, and those firms hire the subs.
  2. Get your paperwork ready before you call: certificate of insurance, W-9, safety program, and proof you can do the footage.
  3. Ask what the state's BEAD rules mean for subs. Workforce, safety and reporting requirements vary by state and are often passed down.
  4. Be findable. List your crew with the states and trades you cover, and watch fiber work on the board.

Other wired BEAD winners in West Virginia

Frontier West VirginiaWV · $186.4 millionComcastWV · $53.3 millionMicrologicWV · $49.3 millionGigabeam NetworksWV · $23.0 millionDigital ConnectionsWV · $21.4 millionArmstrong TelecommunicationsWV · $10.4 million
Want to build for Citynet?

Providers and their primes staff these builds with subcontractors. List your crew with the states and trades you cover so they can find you. Free.

List your crewFiber work on the board

Provisional awards can change as states finalize agreements. TrackOver isn't affiliated with Citynet. All providers.