Burke, County of BEAD awards
Burke, County of won $14.2 million in BEAD grants to serve 899 locations in Georgia, according to the state award lists below. These are wired builds, which means construction: placement, boring, splicing and drops.
Georgia
$14.2 million
899 locations · Fiber · provider match $14.7 million · est. completion January 1, 2030 · about 473 mi buried fiber (state estimate)
Source: Georgia Technology Authority, BEAD Final Proposal data files as submitted (as submitted 2025-09-03)
BEAD grants
$14.2 million
Locations
899
Grant per location
$15,829
Fiber miles (est.)
473 buried · 0 aerial
Latest completion
January 1, 2030
What this build needs from crews
- Underground, about 473 miles. Directional boring, plowing or trenching, conduit and handholes, then restoration. Locates come first on every foot (utility locating).
- Splicing and drops. Every one of the 899 locations needs a drop and a splice at the end (fiber splicing).
How subs usually get on a BEAD build
- Find out who is building. Providers often hand construction to a prime or an engineering and construction firm, and those firms hire the subs.
- Get your paperwork ready before you call: certificate of insurance, W-9, safety program, and proof you can do the footage.
- Ask what the state's BEAD rules mean for subs. Workforce, safety and reporting requirements vary by state and are often passed down.
- Be findable. List your crew with the states and trades you cover, and watch fiber work on the board.
Other wired BEAD winners in Georgia
Want to build for Burke, County of?
Providers and their primes staff these builds with subcontractors. List your crew with the states and trades you cover so they can find you. Free.
Provisional awards can change as states finalize agreements. TrackOver isn't affiliated with Burke, County of. All providers.