Skip to content

ALLO Missouri BEAD awards

ALLO Missouri won $1.1 million in BEAD grants to serve 179 locations in Missouri, according to the state award lists below. These are wired builds, which means construction: placement, boring, splicing and drops.

Missouri
$1.1 million
Listed as ALLO Missouri, LLC · 179 locations · Fiber · provider match $382,700 · est. completion November 30, 2027 · about 5 mi buried fiber (state estimate)
BEAD grants
$1.1 million
Locations
179
Grant per location
$6,414
Fiber miles (est.)
5 buried · 0 aerial
Latest completion
November 30, 2027

What this build needs from crews

How subs usually get on a BEAD build

  1. Find out who is building. Providers often hand construction to a prime or an engineering and construction firm, and those firms hire the subs.
  2. Get your paperwork ready before you call: certificate of insurance, W-9, safety program, and proof you can do the footage.
  3. Ask what the state's BEAD rules mean for subs. Workforce, safety and reporting requirements vary by state and are often passed down.
  4. Be findable. List your crew with the states and trades you cover, and watch fiber work on the board.

Other wired BEAD winners in Missouri

BrightspeedMO · $117.3 millionConexon ConnectMO · $64.6 millionSte Rural BroadbandMO · $51.6 millionHometown InternetMO · $47.4 millionNet Vision CommunicationsMO · $43.1 millionCurrentMO · $41.6 millionStimulus TechnologiesMO · $41.1 millionSpectrumMO · $39.6 million
Want to build for ALLO Missouri?

Providers and their primes staff these builds with subcontractors. List your crew with the states and trades you cover so they can find you. Free.

List your crewFiber work on the board

Provisional awards can change as states finalize agreements. TrackOver isn't affiliated with ALLO Missouri. All providers.