Skip to content

Directional drilling work in Illinois

Open directional drilling posts and crews that work in Illinois. Posting and listing are free.

Illinois BEAD funding and fiber locations

Post work in ILList your crewFind work in ILFind a crew in IL

Open work

Nothing open in Illinois right now

See every open directional drilling post nationwide, or list your crew so the next GC with work in Illinois finds you.

All directional drilling work

Before you dig in Illinois

Call: JULIE (Joint Utility Locating Information for Excavators)
Notice: At least 48 hours / 2 working days (not counting day of notice) before excavation.
Ticket life: 28 days; call again if work extends past 28 days or marks are faded/destroyed.
Tolerance zone: 18 inches on either side of the marked line (hand dig / vacuum).
Illinois 811 rules and sources

Crews that work in Illinois

Broadband infrastructure solutions inc
Available now
Boca Raton, FL · Works in AL, FL, GA, KY, MS, NC…
Directional drillingUnderground fiber and conduitAerial fiber and strandFiber splicing and testingCrew of 5
Directional drilling: Illinois jobs and crews | TrackOver