Union River Telephone Company BEAD awards
Union River Telephone Company won $1.5 million in BEAD grants to serve 119 locations in Maine, according to the state award lists below. These are wired builds, which means construction: placement, boring, splicing and drops.
Maine
$1.5 million
119 locations · Fiber · provider match $1.4 million · est. completion November 30, 2029 · about 5 mi buried + 54 mi aerial fiber (state estimate)
Source: Maine Connectivity Authority, BEAD Final Proposal files (approved) (approved 2025-11-18)
BEAD grants
$1.5 million
Locations
119
Grant per location
$12,510
Fiber miles (est.)
5 buried · 54 aerial
Latest completion
November 30, 2029
What this build needs from crews
- Underground, about 5 miles. Directional boring, plowing or trenching, conduit and handholes, then restoration. Locates come first on every foot (utility locating).
- Aerial, about 54 miles. Make-ready, strand and lash, and pole attachments (aerial fiber), usually with traffic control on the road.
- Splicing and drops. Every one of the 119 locations needs a drop and a splice at the end (fiber splicing).
How subs usually get on a BEAD build
- Find out who is building. Providers often hand construction to a prime or an engineering and construction firm, and those firms hire the subs.
- Get your paperwork ready before you call: certificate of insurance, W-9, safety program, and proof you can do the footage.
- Ask what the state's BEAD rules mean for subs. Workforce, safety and reporting requirements vary by state and are often passed down.
- Be findable. List your crew with the states and trades you cover, and watch fiber work on the board.
Other wired BEAD winners in Maine
Want to build for Union River Telephone Company?
Providers and their primes staff these builds with subcontractors. List your crew with the states and trades you cover so they can find you. Free.
Provisional awards can change as states finalize agreements. TrackOver isn't affiliated with Union River Telephone Company. All providers.