Suwannee Valley Electric Cooperative BEAD awards
Suwannee Valley Electric Cooperative won $2.5 million in BEAD grants to serve 765 locations in Florida, according to the state award lists below. These are wired builds, which means construction: placement, boring, splicing and drops.
Florida
$2.5 million
Listed as SUWANNEE VALLEY ELECTRIC COOPERATIVE INC · 765 locations · Fiber · provider match $833,801 · est. completion January 1, 2028 · about 18 mi buried fiber (state estimate)
Source: FloridaCommerce Office of Broadband, BEAD Final Proposal Attachments A-C (retrieved 2026-09-23)
BEAD grants
$2.5 million
Locations
765
Grant per location
$3,270
Fiber miles (est.)
18 buried · 0 aerial
Latest completion
January 1, 2028
What this build needs from crews
- Underground, about 18 miles. Directional boring, plowing or trenching, conduit and handholes, then restoration. Locates come first on every foot (utility locating).
- Splicing and drops. Every one of the 765 locations needs a drop and a splice at the end (fiber splicing).
How subs usually get on a BEAD build
- Find out who is building. Providers often hand construction to a prime or an engineering and construction firm, and those firms hire the subs.
- Get your paperwork ready before you call: certificate of insurance, W-9, safety program, and proof you can do the footage.
- Ask what the state's BEAD rules mean for subs. Workforce, safety and reporting requirements vary by state and are often passed down.
- Be findable. List your crew with the states and trades you cover, and watch fiber work on the board.
Other wired BEAD winners in Florida
Want to build for Suwannee Valley Electric Cooperative?
Providers and their primes staff these builds with subcontractors. List your crew with the states and trades you cover so they can find you. Free.
Provisional awards can change as states finalize agreements. TrackOver isn't affiliated with Suwannee Valley Electric Cooperative. All providers.