Point Broadband Fiber Holding BEAD awards
Point Broadband Fiber Holding won $47.8 million in BEAD grants to serve 6,093 locations in Virginia, Michigan, and Alabama, according to the state award lists below. These are wired builds, which means construction: placement, boring, splicing and drops.
Virginia
$23.4 million
Listed as POINT BROADBAND FIBER HOLDING, LLC · 2,452 locations · Fiber · provider match $7.8 million · est. completion January 1, 2030
Dickenson County (813), Wythe County (491), Russell County (375), Buchanan County (353), Washington County (208), Tazewell County (189), Smyth County (23)
Source: Virginia DHCD Office of Broadband, Final Proposal data uploads (10.24.25) and Awards by Jurisdiction and ISP (data files dated 2025-10-24)
Michigan
$22.6 million
Listed as Point Broadband Fiber Holding, LLC · 2,694 locations · Fiber · provider match $7.7 million · est. completion October 15, 2028 · about 1,161 mi buried + 782 mi aerial fiber (state estimate)
Source: Michigan High-Speed Internet Office (MIHI), BEAD Final Proposal data uploads (September 2025, with scope change 2) (files dated 2025-09-09)
Alabama
$1.8 million
Listed as POINT BROADBAND FIBER HOLDING LLC · 947 locations · Fiber · provider match $607,238 · est. completion February 1, 2030 · about 5 mi buried + 31 mi aerial fiber (state estimate)
Source: Alabama ADECA, BEAD Final Proposal data files (files updated 2026-04-28)
BEAD grants
$47.8 million
Locations
6,093
Grant per location
$7,839
Fiber miles (est.)
1,166 buried · 813 aerial
Latest completion
February 1, 2030
What this build needs from crews
- Underground, about 1,166 miles. Directional boring, plowing or trenching, conduit and handholes, then restoration. Locates come first on every foot (utility locating).
- Aerial, about 813 miles. Make-ready, strand and lash, and pole attachments (aerial fiber), usually with traffic control on the road.
- Splicing and drops. Every one of the 6,093 locations needs a drop and a splice at the end (fiber splicing).
How subs usually get on a BEAD build
- Find out who is building. Providers often hand construction to a prime or an engineering and construction firm, and those firms hire the subs.
- Get your paperwork ready before you call: certificate of insurance, W-9, safety program, and proof you can do the footage.
- Ask what the state's BEAD rules mean for subs. Workforce, safety and reporting requirements vary by state and are often passed down.
- Be findable. List your crew with the states and trades you cover, and watch fiber work on the board.
Other wired BEAD winners in the same states
Want to build for Point Broadband Fiber Holding?
Providers and their primes staff these builds with subcontractors. List your crew with the states and trades you cover so they can find you. Free.
Provisional awards can change as states finalize agreements. TrackOver isn't affiliated with Point Broadband Fiber Holding. All providers.