Outpost Plus BEAD awards
Outpost Plus won $317,976 in BEAD grants to serve 68 locations in Utah, according to the state award lists below. These are wired builds, which means construction: placement, boring, splicing and drops.
Utah
$317,976
Listed as Outpost Plus, LLC · 68 locations · Fiber · provider match $105,992 · est. completion February 1, 2030 · about 1 mi buried + 1 mi aerial fiber (state estimate)
Source: Utah Broadband Center, BEAD Final Proposal files (retrieved 2026-09-23)
BEAD grants
$317,976
Locations
68
Grant per location
$4,676
Fiber miles (est.)
1 buried · 1 aerial
Latest completion
February 1, 2030
What this build needs from crews
- Underground, about 1 miles. Directional boring, plowing or trenching, conduit and handholes, then restoration. Locates come first on every foot (utility locating).
- Aerial, about 1 miles. Make-ready, strand and lash, and pole attachments (aerial fiber), usually with traffic control on the road.
- Splicing and drops. Every one of the 68 locations needs a drop and a splice at the end (fiber splicing).
How subs usually get on a BEAD build
- Find out who is building. Providers often hand construction to a prime or an engineering and construction firm, and those firms hire the subs.
- Get your paperwork ready before you call: certificate of insurance, W-9, safety program, and proof you can do the footage.
- Ask what the state's BEAD rules mean for subs. Workforce, safety and reporting requirements vary by state and are often passed down.
- Be findable. List your crew with the states and trades you cover, and watch fiber work on the board.
Other wired BEAD winners in Utah
Want to build for Outpost Plus?
Providers and their primes staff these builds with subcontractors. List your crew with the states and trades you cover so they can find you. Free.
Provisional awards can change as states finalize agreements. TrackOver isn't affiliated with Outpost Plus. All providers.