Maverix Broadband BEAD awards
Maverix Broadband won $103.1 million in BEAD grants to serve 10,232 locations in Colorado, according to the state award lists below. These are wired builds, which means construction: placement, boring, splicing and drops.
Colorado
$103.1 million
Listed as Maverix Broadband, Inc. · 10,232 locations · Fiber · provider match $35.6 million · est. completion August 1, 2030 · about 781 mi buried + 266 mi aerial fiber (state estimate)
Source: Colorado Broadband Office, BEAD Final Proposal data uploads (files updated 2025-12-16)
BEAD grants
$103.1 million
Locations
10,232
Grant per location
$10,079
Fiber miles (est.)
781 buried · 266 aerial
Latest completion
August 1, 2030
What this build needs from crews
- Underground, about 781 miles. Directional boring, plowing or trenching, conduit and handholes, then restoration. Locates come first on every foot (utility locating).
- Aerial, about 266 miles. Make-ready, strand and lash, and pole attachments (aerial fiber), usually with traffic control on the road.
- Splicing and drops. Every one of the 10,232 locations needs a drop and a splice at the end (fiber splicing).
How subs usually get on a BEAD build
- Find out who is building. Providers often hand construction to a prime or an engineering and construction firm, and those firms hire the subs.
- Get your paperwork ready before you call: certificate of insurance, W-9, safety program, and proof you can do the footage.
- Ask what the state's BEAD rules mean for subs. Workforce, safety and reporting requirements vary by state and are often passed down.
- Be findable. List your crew with the states and trades you cover, and watch fiber work on the board.
Other wired BEAD winners in Colorado
Want to build for Maverix Broadband?
Providers and their primes staff these builds with subcontractors. List your crew with the states and trades you cover so they can find you. Free.