Gallatin Wireless Internet (Celerity Internet) BEAD awards
Gallatin Wireless Internet (Celerity Internet) won $157.1 million in BEAD grants to serve 10,615 locations in Montana and South Dakota, according to the state award lists below. These are wired builds, which means construction: placement, boring, splicing and drops.
Montana
$102.6 million
Listed as GALLATIN WIRELESS INTERNET, LLC · 7,844 locations · Fiber (52%) / Licensed fixed wireless (48%) · provider match $19.7 million · est. completion April 2, 2030 · about 813 mi buried fiber (state estimate)
Source: Montana ConnectMT, BEAD Final Proposal files (approved) (approved 2026-01-05)
South Dakota
$54.5 million
Listed as Gallatin Wireless Internet LLC dba Celerity Internet · 2,771 locations · Fiber (94%) / LFW (6%) · provider match $12.8 million · about 434 mi buried + 20 mi aerial fiber (state estimate)
Source: South Dakota GOED, BEAD Final Proposal files (files posted 2025-10, locations 2026-09)
BEAD grants
$157.1 million
Locations
10,615
Grant per location
$14,803
Fiber miles (est.)
1,247 buried · 20 aerial
Latest completion
April 2, 2030
What this build needs from crews
- Underground, about 1,247 miles. Directional boring, plowing or trenching, conduit and handholes, then restoration. Locates come first on every foot (utility locating).
- Aerial, about 20 miles. Make-ready, strand and lash, and pole attachments (aerial fiber), usually with traffic control on the road.
- Splicing and drops. Every one of the 10,615 locations needs a drop and a splice at the end (fiber splicing).
How subs usually get on a BEAD build
- Find out who is building. Providers often hand construction to a prime or an engineering and construction firm, and those firms hire the subs.
- Get your paperwork ready before you call: certificate of insurance, W-9, safety program, and proof you can do the footage.
- Ask what the state's BEAD rules mean for subs. Workforce, safety and reporting requirements vary by state and are often passed down.
- Be findable. List your crew with the states and trades you cover, and watch fiber work on the board.
Other wired BEAD winners in the same states
SpectrumMT · $27.3 millionBlackfoot Telephone CooperativeMT · $26.2 millionMidco CommunicationsSD · $12.9 millionSiyeh CommunicationsMT · $9.0 millionGrizzly BroadbandMT · $8.5 millionInterbel Telephone CooperativeMT · $5.7 millionMontana Internet CorporationMT · $4.6 millionRange Telephone CooperativeMT · $4.1 million
Want to build for Gallatin Wireless Internet (Celerity Internet)?
Providers and their primes staff these builds with subcontractors. List your crew with the states and trades you cover so they can find you. Free.
Provisional awards can change as states finalize agreements. TrackOver isn't affiliated with Gallatin Wireless Internet (Celerity Internet). All providers.