Fiber Broadband (Terabit) BEAD awards
Fiber Broadband (Terabit) won $8.4 million in BEAD grants to serve 655 locations in Utah, according to the state award lists below. These are wired builds, which means construction: placement, boring, splicing and drops.
Utah
$8.4 million
Listed as Fiber Broadband INC dba Terabit · 655 locations · Fiber · provider match $2.9 million · est. completion February 1, 2030 · about 68 mi buried fiber (state estimate)
Source: Utah Broadband Center, BEAD Final Proposal files (retrieved 2026-09-23)
BEAD grants
$8.4 million
Locations
655
Grant per location
$12,755
Fiber miles (est.)
68 buried · 0 aerial
Latest completion
February 1, 2030
What this build needs from crews
- Underground, about 68 miles. Directional boring, plowing or trenching, conduit and handholes, then restoration. Locates come first on every foot (utility locating).
- Splicing and drops. Every one of the 655 locations needs a drop and a splice at the end (fiber splicing).
How subs usually get on a BEAD build
- Find out who is building. Providers often hand construction to a prime or an engineering and construction firm, and those firms hire the subs.
- Get your paperwork ready before you call: certificate of insurance, W-9, safety program, and proof you can do the footage.
- Ask what the state's BEAD rules mean for subs. Workforce, safety and reporting requirements vary by state and are often passed down.
- Be findable. List your crew with the states and trades you cover, and watch fiber work on the board.
Other wired BEAD winners in Utah
Want to build for Fiber Broadband (Terabit)?
Providers and their primes staff these builds with subcontractors. List your crew with the states and trades you cover so they can find you. Free.
Provisional awards can change as states finalize agreements. TrackOver isn't affiliated with Fiber Broadband (Terabit). All providers.