Skip to content

Claverack BEAD awards

Claverack won $9.0 million in BEAD grants to serve 1,247 locations in Pennsylvania, according to the state award lists below. These are wired builds, which means construction: placement, boring, splicing and drops.

BEAD grants
$9.0 million
Locations
1,247
Grant per location
$7,254

What this build needs from crews

  • Placement. The state files don't split buried from aerial miles for Claverack, so expect both underground and aerial work.
  • Splicing and drops. Every one of the 1,247 locations needs a drop and a splice at the end (fiber splicing).

How subs usually get on a BEAD build

  1. Find out who is building. Providers often hand construction to a prime or an engineering and construction firm, and those firms hire the subs.
  2. Get your paperwork ready before you call: certificate of insurance, W-9, safety program, and proof you can do the footage.
  3. Ask what the state's BEAD rules mean for subs. Workforce, safety and reporting requirements vary by state and are often passed down.
  4. Be findable. List your crew with the states and trades you cover, and watch fiber work on the board.

Other wired BEAD winners in Pennsylvania

ComcastPA · $162.1 millionVerizonPA · $108.8 millionCoreConnectPA · $90.7 millioneCommunityPA · $84.3 millionCentral Bradford Progress AuthorityPA · $73.5 millionBrightspeedPA · $41.7 millionCommonwealth Telephone Company (Frontier Communications)PA · $28.5 millionArmstrong CablePA · $19.9 million
Want to build for Claverack?

Providers and their primes staff these builds with subcontractors. List your crew with the states and trades you cover so they can find you. Free.

List your crewFiber work on the board

Provisional awards can change as states finalize agreements. TrackOver isn't affiliated with Claverack. All providers.