The excavation estimate checklist

Twenty-five things that eat your margin. Walk it before you bid and check it before you send.

What should an excavation estimate checklist cover? Five things: the site visit (access, overhead lines, 811, private utilities, soil, water, photos), the scope words that protect you (rock, bad soil, dewatering, haul-off, restoration, weather), how you price machine time and trucking, how change orders get signed, and the payment terms (deposit, progress billing, retainage).

The five sections

A. Site visit

Access, overhead lines, 811, private utilities, soil, water and drainage, photos and notes. Do not price from the truck.

B. Scope words that protect you

Rock, unsuitable soil, dewatering, haul-off and dump fees, restoration, weather days and delays, in plain words on the estimate.

C. Machine time and trucking

A machine rate built from your own costs, hours instead of feet, operator and burden, trucking by the cycle, mobilization, then overhead and margin as their own line.

D. Change orders

Name the trigger, stop and write it up, get a signature before the work, and keep it with the job.

E. Payment terms

Deposit, progress billing at points you can see, and retainage with how much, what releases it and by when.

Checklist, printable

Use your own terms and your own numbers. This is a thinking aid, not a price list.

#CheckSectionDone
1Access for the lowboy and trucks, wet weather includedA. Site visit[ ]
2Overhead lines near the dig or the dump bedA. Site visit[ ]
3811 ticket number and date written on the estimateA. Site visit[ ]
4Private utilities: well, septic, propane, irrigation, buried electricA. Site visit[ ]
5Soil: clay, sand, fill, ledge, boulders, old debrisA. Site visit[ ]
6Water table and drainageA. Site visit[ ]
7Dated photos of the site before you touch itA. Site visit[ ]
8Rock clause: what is priced, how rock is measured and approvedB. Scope words[ ]
9Unsuitable soil: who decides, what comes out and goes inB. Scope words[ ]
10Dewatering in or outB. Scope words[ ]
11Haul-off, dump and scale fees, and who owns the spoilB. Scope words[ ]
12Restoration: what you put back and what you do notB. Scope words[ ]
13Weather days, delays and extra machine movesB. Scope words[ ]
14Machine rate from your own costs and real working hoursC. Pricing[ ]
15Hours by task, plus moving, waiting and cleanupC. Pricing[ ]
16Operator and crew at real cost with burdenC. Pricing[ ]
17Trucking by the round-trip cycleC. Pricing[ ]
18Mobilization, then overhead and margin as their own lineC. Pricing[ ]
19Change order triggers listed on the estimateD. Change orders[ ]
20Stop, photograph and write up the changeD. Change orders[ ]
21Signature or written reply before the workD. Change orders[ ]
22Signed change filed with the estimate and photosD. Change orders[ ]
23Deposit before a machine movesE. Payment terms[ ]
24Progress billing points and due datesE. Payment terms[ ]
25Retainage: how much, what releases it, by what dateE. Payment terms[ ]

Before you send it: estimate valid until a date, who pulls permits, 811 ticket number, deposit due date, photos filed, change order form attached, and a customer signature line. Contract rules vary by state, so check yours. This list is a practical aid, not legal advice.

Common questions

What should an excavation estimate checklist cover?

Five things: the site visit (access, overhead lines, 811, private utilities, soil, water, photos), the scope words that protect you (rock, bad soil, dewatering, haul-off, restoration, weather), how you price machine time and trucking, how change orders get signed, and the payment terms (deposit, progress billing, retainage).

Why walk the site before bidding?

Because pricing from the truck misses the things that cost hours: a tight turn for the lowboy, wires over the dig, soft ground, a private line nobody marked. Photos with the date on them also protect you on existing damage.

What is a rock clause?

A line on the estimate that says you priced soil only, and what happens if you hit rock, ledge or boulders: how it is measured, how it is priced, and that the customer approves it before you go on.

When should a change order be signed?

Before you dig the changed part. When a trigger such as rock, water or a line you did not know about shows up, pause that part, photograph it, write the change in plain words with the added cost and time, and get a signature or written reply. A phone call is not a record.

Is this checklist really free?

Yes. No email, no signup, no watermark. Print it and use your own terms and numbers. Check your state's contract rules before relying on any wording.

Related: estimate template, excavation invoice template, change orders, TrackOver for excavation

Build the estimate and change order on your phone?

TrackOver turns an estimate into a job and a change order into a line on the invoice, without retyping. 7-day free trial, no card needed.

Try TrackOver free

7-day free trial, no card needed. See it in 2 minutes