Skip to content
Free tool

Snow pile and hauling calculator

How much snow is on the lot, how much ground the piles will take, and how many loads it is to haul it off.

Piles and hauling
556
cubic yards of snow
3,750
sq ft of pile area at 8 ft high
12.5%
of the lot used by piles
56
truckloads at 10 yd each
30,000
sq ft plowed
556
cubic yards in the piles
about 23
parking stalls of pile (9 x 18 ft)

Snow volume is straight geometry. Packing and mound shape are rules of thumb: plowed snow usually packs down, and a pile with sloped sides holds roughly half of a square-sided block. Leaving packing at 0% plans for the biggest pile. Use the yards your own trucks actually haul.

More free calculators:

SlopeAsphaltGravelRoofingAll tools

How much snow is on a parking lot? Multiply the plowed area in square feet by the snow depth in inches, divide by 12 for cubic feet, then by 27 for cubic yards. A one acre lot, about 43,560 square feet, with 6 inches of snow is about 21,780 cubic feet, or roughly 807 cubic yards, before it packs down in the pile.

Common questions

How much snow is on a parking lot?

Multiply the plowed area in square feet by the snow depth in inches, divide by 12 for cubic feet, then by 27 for cubic yards. A one acre lot, about 43,560 square feet, with 6 inches of snow is about 21,780 cubic feet, or roughly 807 cubic yards, before it packs down in the pile.

How much space do snow piles need?

Divide the pile volume by the pile height to get the footprint of a square-sided block, then allow more because a real pile slopes. A mound with sloped sides holds roughly half what a box of the same footprint and height would, so a common rule of thumb is to plan about twice the block footprint. Plowed snow packs down, so the real pile is usually smaller than the fresh snow volume.

How many truckloads does it take to haul snow off a lot?

Divide the snow volume in cubic yards by what each truck carries per load. Capacity depends on the truck and whether the snow is loose or packed, so use the yards your own trucks actually haul. Round up, because a partial load is still a trip.

Where should snow piles go on a commercial lot?

Somewhere that does not block drainage, fire hydrants, accessible parking or the sight lines at entrances and exits, and on the low side of the lot so meltwater does not run back across the pavement and refreeze. Agree the pile locations with the property before the season, not during the first storm.

When does snow need to be hauled away instead of piled?

When the piles would take up parking the property needs, block sight lines, or simply stop fitting. On a tight lot in a heavy winter, the calculator's percent of lot used by piles is the number to watch: once piles are eating a large share of the spaces, hauling or relocating snow starts to cost less than the lost parking.

Running a snow operation?

TrackOver tracks every storm: which sites were serviced, when, by which crew, with photos and a service log for each property.

Find your tradeSee a demo